Track & runner facilities
| Track | Length | Lanes |
|---|---|---|
| Running track | 250m | 5 |
- Surface
- All-weather
Runner essentials
- Toilets
- Listed
- Changing rooms
- Listed
- Lockers
- Not confirmed
- Showers
- Not confirmed
- Drinking water
- Not confirmed
Track, facilities & accessibility details
Surface: All-weather synthetic
Other facilities
- Seven-a-side and five-a-side football pitch
- Shot-put ring
- Long-jump sand pits
- High-jump equipment
- 500-seat stand
Accessibility
- Accessible Toilet, Tactile Guide Path, Braille Directory Map/Floor Plan
Getting there
Fa Peng Road, Cheung Chau, Hong Kong
Ferry
Not confirmed in the listed facilities
View listed routes and destinations
LCSD access notes
Take the ferry from Central Pier 5 and walk about 15 minutes from Cheung Chau Pier towards Kwun Yam Wan.
| Mode | Route | Service |
|---|---|---|
| Ferry | — | To take ferry from Central Piers Terminal (Pier 5) to Cheung Chau and walk about 15 mins from Cheung Chau Pier towards Kwun Yam Wan. |
Original LCSD travel notes
To take ferry from Central Piers Terminal (Pier 5) to Cheung Chau and walk about 15 mins from Cheung Chau Pier towards Kwun Yam Wan.
LCSD-listed routes, not live arrivals. Plan current public transport
Information & help
Official sources
Sources & review dates
Venue facts reviewed against LCSD: · Disclaimers & legal notices
Transport, accessibility and parking checked .
Timetable snapshot refreshed . A source check is not a live guarantee of access.
Practical questions
Does the lane count mean all lanes are open?
No. The track specification describes the facility. Public access can be limited to particular lanes or paths by bookings and works. Use the dated timetable for your planned session.
Are unconfirmed facilities the same as unavailable?
No. It means the reviewed source does not establish availability. Call the venue if a shower, water point or other facility is important to your visit.